| 21 Steel Place Morningside QLD 4170 PO Box 297 , Cannon Hill Qld 4170 www.danley.com.au Phone: (07) 3899 3466 Fax: (07) 3899 1733 Email: info@danley.com.au |
|
|
|
|
![]() |
||
|
TILTLOK
SYSTEMS
|
||
|
Here at SPEEDIBOLT we've
developed a practical and cost effective solution to the support of
concrete tilt-up walls during a fire.
Our TILTLOK Column Ties have been designed and tested to meet the requirements of the Building Code of Australia. They are available ex stock as part of our range of standard products for the steel fabrication industry. For further information or a quotation please give us a call. |
![]()
|
|
|
LIMITATIONS
|
TILTLOK
Column Ties
|
|
|
1. Height of vertical panels must not exceed
9 m. |
TILTLOK Deformable Column Ties are designed to provide support to concrete tilt-up walls during a fire. Deformable column ties are now required for buildings incorporating steel portal frames, beams and columns, as part of the Building Code of Australia | |
|
INSTALLATION
DETAILS
|
||
| TILTLOK Deformable Column Ties have been designed and tested to meet the performance criteria of BCA Specification Cl.1 1 and BHP Structural Steel Development Group Technical Note Issue No.1, March 1995 " Single Storey Steel-framed Buildings - Support of External Walls in Fire". |
![]() |
|
![]() |
||